top of page

Scaffold Towers for Long-Term Renovation Work in La Palma

Sep 16
1 min read

Since the Cumbre Vieja eruption in 2021, La Palma has seen an unusually high volume of long-term reconstruction and renovation work. If your project falls into this category, shipping certified equipment from Tenerife can be a viable option.


Why we mention La Palma specifically

It isn't an island we cover as a matter of routine, but the volume of long-term renovation work following the eruption makes it worth offering the service on request for projects of sufficient size.


The kind of work this makes sense for

  • Rebuilding homes or affected buildings on timescales running to several months

  • Refurbishment of infrastructure or public buildings

  • Projects where local availability of certified scaffolding is stretched by the island's own demand


Process and timescales

The same as on the other islands: a quote with logistics included, transport by ferry, and coordination of assembly if that's part of the contract. We'd recommend getting in touch as far in advance as possible, given how much construction work may be underway on the island at any given time.



bottom of page